Condensed Specification: Carbon Strip/Ice Cutter Heater System

This is the product portion of a specification for the RTR Carbon Strip/Ice Cutter Heater System.  For a complete specification that includes installation and testing recommendations, contact RTR.

Part 1 - General

Furnish and install an RTR Carbon Strip/Ice Cutter Heater System complete with terminated heating cable, installation accessories and controls.

Part 2 - Products

2.1:

The terminated heating cable shall be shown in RTR 306XXX Series Drawings.

 

2.2:

The heating cable shall consist of two (2) 14 AWG nickel plated copper buss wires embedded in parallel in a self-regulating polymer core.  Power output shall vary in response to temperature uniformity along its entire length, allowing the cable to be crossed over on itself without overheating.

 

2.3:

The heating cable shall be of parallel circuit construction.

 

2.4:

The heating cable shall operate on (Select 480, 600. 750, 1500 VAC or VDC) without the use of transformers.

 

2.5:

The heating cable shall be 450V, 600V, or 750V or 1500V as manufactured by RTR.

 

2.6:

The Carbon Strip/Ice Cutter Heating System shall be controlled by a relay, switch, thermostat or other controller through an appropriate contactor.

 

2.7:

The heating cable power terminations and end seals shall be factory fabricated as described in RTR 802XXX Series Process Instructions.

Part 3 - Installation

3.1:

The heating cable shall be installed in the Carbon Strip/Ice Cutter according to the manufacturers recommendations, and installation instructions.

 

3.2:

The heating cable shall be installed only in Carbon Strip/Ice Cutters which have been pre-qualified by RTR.

 

3.3:

All steps necessary to protect the heating cable assembly, terminations, cold lead wires and installation accessories from mechanical damage during installation shall be taken by the installer.

 

3.4:

Heating cable repairs shall be made using repair kits provided by the manufacturer and specifically approved for the purpose.  All repaired heating cable assemblies shall pass the manufacturers required Megger test after installation.

Part 4 - Testing

After installation of the heating cable into the Carbon Strip/Ice Cutter, the heating cable shall be tested for insulation resistance with a 2500Vdc Megger.  Minimum pass criteria: 1000 megohms ft.

Pan Head De-Icing Reference List

Description Customer QTY Program
Carbon Strip Heater Schunk 1552

Denver, Minneapolis, Pittsburgh,

Salt Lake City, St. Louis

Carbon Strip Heaters Maryland Transit 50 MDMTA LRV
Carbon Strip Heaters Trans Tech 32 Seattle LRV
Carbon Strip Junction Box UTA 23 Salt Lake City LRV
Ice Cutter Schunk 338

Denver, Minneapolis, Pittsburgh,

Salt Lake City, St. Louis

 

48 Main Street   P.O. Box 67   Stockbridge, MA  01262   Tel: 413-298-0025   Toll Free: 1-800-770-9997   Fax: 413-298-3130   info@rtrtechnologies.com

© 2006 RTR Technologies, Inc. - All Rights Reserved.  Site Created by Generation Productions